Jul 26, 2012
Texas Technical Ceramics, Inc. (TTC) has been awarded a three (3) year contract with Backer EHP for mass production of approximately 45 Million ceramic parts per the contract terms.

Jun 29, 2012
Thielsch Engineering, Inc. Awarded 750K Contract by Grand River Dam Authority for Turnkey High Energy Piping Assessment at Coal-Fired Complex in Chouteau, OK .

May 24, 2012
Thielsch Engineering, Inc. was commissioned in April to support the production initiatives of Capital Power and its newly retained stations located in New England.

Apr 22, 2012
Robert (Bob) Smoske will be assisting Thielsch Enginnering in his newly appointed role as Vice President of Business Development. Robert has been with Thielsch for 17 years and has 25 years within the industry.

Apr 22, 2012
Targeted Boiler Training is offered to key personnel responsible for plant maintenance, management and operations. The onsite training is designed to be unit specific and is proven to be highly beneficial to coal, gas, and/or combined cycle plants.

Feb 10, 2012
Dr. Sumeet (Sam) Mathur, M.D, F.A.C.S and his staff announce the opening of a new location for Laurel ENT and Allergy in Latrobe, PA.

Feb 10, 2012
The contract includes the condition assessment of the boiler and high-energy piping components at Choteau natural gas-fired plant in Oklahoma, the Thomas Hill coal-fired power plant, and the New Madrid coal-fired power plant, both in Missouri.

Dec 07, 2011
Thielsch Engineering, Inc. is pleased to announce its completion of a five month international project with Alcoa’s Suriname Aluminum Company, L.L.C. (Suralco).

Oct 11, 2011
The 4-SYTE System Strategy is an interactive data management program that gives energy and utility companies access to initial design, repairs, updates and operational information of critical boiler and piping systems in “real-time.”