Filter By Industry
Filter By Tag

Newsroom

Alifab Press releases

21 - 24 of 24 Press Releases

Apr 28, 2012
Light weight Aircraft Hangars that are easy to erect in difficult to access areas.

Apr 16, 2012
DLC appointed Rapid Building Solutions to complete the erection of their Phase 1 hall on their new site in Tembisa.

Apr 05, 2012
RoofGrip Access Walkway System was chosen by the professional team on the Blue Route Mall as the means to gain safe and controlled access to the roofsheet space on the mall extension.

Jan 05, 2011
Roof Grip protects the roof at the new King Shaka Airport in Durban, South Africa.


Page: Prev 1 2 3
Alifab RSS Feed