Filter By Industry
Filter By Tag

Newsroom

Bruel and Kjaer UK Press releases

191 - 200 of 281 Press Releases

Mar 15, 2011
INPE, Brazil has selected Brüel & Kjær as supplier of their replacement data acquisition and vibration test system for satellite launch simulation and qualification testing.

Mar 12, 2011
With manufacturers facing constant pressure to shorten product design cycles, accelerating traditional vibration test times is a critical consideration.

Mar 08, 2011
Copenhagen Airport (CPH), located just eight kilometres southeast of the city centre, is Scandinavia’s main airport.

Mar 02, 2011
Brüel & Kjær adds ‘moving source’ software option to data analyser system

Feb 22, 2011
Waterproof Accelerometer cable now available from Brüel & Kjær

Feb 14, 2011
The last Sound Level Meter Type 2260 has left the Brüel & Kjær production line.

Feb 08, 2011
Sound quality testing using consumer panels is now a much quicker process with Brüel & Kjær’s new Headphone Amplifier ZE-0769-004.

Jan 11, 2011
Experience the latest and greatest within structural dynamics - and network with colleagues from around the world at Florida-based IMAC XXIX conference.

Dec 13, 2010
Bruel and Kjaer UK launches theory and practical 2011 courses

Dec 08, 2010
In a competitive bid process, which took more than 18-months to complete, the Brüel & Kjær EMS Team was chosen to replace the Noise and Flight Track Management System (NFTMS) for the Burbank-Glendale-Pasadena Airport Authority.


Page: Prev 18 19 20 21 22 Next
Bruel and Kjaer UK RSS Feed